DATE: June 25, 2017
TIME: 11:00 a.m. – 12:00 p.m.
LOCATION: Conference Call 1-866-906-7447
Participant Access Code 8626283
AGENDA ITEMS
Call to Order
Open Projects
Project # and Title | PI, University
AC Liaison |
Update | End Date |
06-04: Preventive Maintenance and Timing of Applications | Mogawer,
UMass Dartmouth
C. Franco |
PI is finalized the report and is working on the poster and fact sheet. We are editing the report for the website. | Complete |
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology | Mogawer,
UMass Dartmouth
A. Scholz |
PI is finalizing the report and scheduling a TAC meeting to receive feedback. | 5/31/17 |
13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections | Brena,
UMass Amherst
MassDOT |
Contract extension in process between UVM and Amherst, awaiting UMass signatures. | 12/31/17
(NCE) |
13-2: HMA Mixtures Containing Recycled Asphalt Shingles (RAS): Low Temperature and Fatigue Performance of Plant-Produced Mixtures | Mogawer,
UMass Dartmouth
A. Scholz |
PI met with TAC to update them on new work plan to maintain research schedule. More of the mixtures will be produced in the lab because unable to get them from the plants. TAC supported change. | 12/1/17 |
13-3: Improved Regionalization of Quality Assurance (QA) Functions | Dave,
UNH
C. Franco |
Final report in NETC format expected this week. | 4/2/17 (NCE) |
14-1: Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians | Ahmadjian,
UMass Amherst
D. Peabody |
No cost extension fully executed between UVM and Amherst. Project ongoing. | 12/31/17 (NCE) |
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges | Civjan,
UMass Amherst
D. Peabody |
Received final report and final edits and approval from TAC. Completing final review and edit for website. | 5/31/17
(NCE) |
14-4: Optimizing Future Work Zones in New England for Safety and Mobility | Xie,
UMASS Lowell
MassDOT |
The PI researching motion simulators and eye tracking devices to improve simulation testing. TAC has approved NCE request. | 12/31/17
(NCE Requested) |
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats | Foster, UNH
D. Peabody |
Held kickoff meeting at UNH. TAC pleased with strategy and PI has received some of the audio data needed from states. PI now has dual appointment at UNH and Northern Arizona University. | 11/30/18 |
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers | Samuel,
UMass Amherst
D. Peabody |
PI has Roadway Information Data, completed IRB for SHRP2 and expects SHRP2 data by end of August. | 12/31/18 |
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England | Dave,
UNH
D. Peabody |
PI analyzed survey results from all six states to plan lab tests. Sampled mixtures from VT and ME and expect to sample more this summer. Started to test the mixes that they have. | 7/31/18 |
15:4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction
in the Northeast |
TBD
A. Scholz |
Working with 13-3 PI to set up meeting with TAC to review lessons learned from that project to restart this project | TBD |
*Final Tech Transfer Items: Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available. |
NETC Fund Balance Update
- All previous fund transfers have been completed
- FY2016 Fund Balance Transfers – 0.00
- FY2017 Fund Balance Transfers – Decision deferred, but budgeted by each state
- FY2018 Fund Balance Transfers
- NETC Unallocated Balance as of 7/24/2017 – $139,278.00
- NETC Coordinator funded through 9/1/2018
NETC Research Processes
- Start NETC Research Solicitation Process
- 15 month process
- Traditionally, starts in November
- Can be started with one coordinator and transferred, if needed
- Consider “Implement recommendations on Effective Establishment of Native Plants on Roadsides” for full research solicitation process
- Quick Response Projects
- “Pre-TAC” for AV/CV Vehicles?
- Discuss “Pre-TAC” recommendations at next meeting
New England Materials and Research Engineers Meeting
- Discussion of regionalization through National Transportation Product Evaluation Program
- Several areas for potential regional research and regional audit programs
- Concrete blocks, pavement marking paint, binder QC plans
- Will work with NEMREM to schedule when more people are available next year
- Several areas for potential regional research and regional audit programs
NETC SOP
- Updating to reflect discussions at retreat
- Include quick response
- Update tech transfer language
- Lead state to issues contracts
Other Business
- NETC Advisory Meeting Next Monthly Meeting – Tuesday, August 22nd at 11am
Adjourn